THERMAL EXPANSION
              Maximum spacing of support brackets for 316 System tube, BS 4127 and W541
                stainless steel tube and plastic coated and galvanised carbon steel tube  When including expansion joints in a system take care not to introduce
                                                                tensional stress when assembling and tightening threaded connections.
                   Size         Horizontal pitch  Vertical pitch
                                                                The XPress range includes male and female connectors for the correct
                   15mm            1.80m           2.00m
                                                                jointing of expansion joints.
                   18mm            2.10m           2.30m
                                                                CORRECT ANCHORING
                   22mm            2.40m           3.00m
                                                                Always ensure the spur used to anchor the branch of a tee or
                   28mm            2.40m           3.00m
                                                                connecting a radiator is long enough to allow normal thermal
                   35mm            2.70m           3.00m
                                                                movement. Forgetting to observe this simple rule can lead to a failure.
                   42mm            3.00m           3.60m
                                                                Incorporating expansion loops or bellow devices into the system can
                   54mm            3.00m           3.60m        help guard against such problems, whilst a horseshoe link or offset (see
                  76.1mm           3.00m           3.60m        diagrams) is an ideal way to counteract continual thermal cycling.
                  88.9mm           3.60m           4.50m        PIPE RESTRAINT
                   108mm           3.60m           4.50m
                                                                In any installation, the system should be supported to ensure the
                                                                minimum stress is imposed on the tube/pipe and joints. For the
                Maximum spacing of support brackets for copper tube to BS EN 1057  maximum spacing of supporting brackets for internal installations,
                                                                please see the tables (opposite).
                Size   Wall thickness  Temper  Horizontal pitch  Vertical pitch  LOCAL WATER AUTHORITY
                12mm     0.7mm    R250/R290  1.00m    1.50m
                                                                We recommend consulting the local water authority when it comes to
                15mm     0.7mm    R250/R290  1.20m    1.80m     pipework accessibility.
                15mm     1.0mm    R250/R290  1.20m    1.80m
                                                                BUILDING IN DIMENSIONS
                22mm     0.9mm    R250/R290  1.80m    2.40m
                                                                All building in dimensions are correct at the time of going to press.
                22mm     1.0mm    R250/R290  1.80m    2.40m
                                                                Pegler Yorkshire reserves the right to change these dimensions without
                22mm     1.2mm    R250/R290  1.80m    2.40m
                                                                prior notice, however to ensure you are using the most up to date
                28mm     0.9mm    R250/R290  1.80m    2.40m     information please refer to our web site
                28mm     1.0mm    R250/R290  1.80m    2.40m     www.pegleryorkshire.co.uk
                28mm     1.2mm    R250/R290  1.80m    2.40m     COVERED PIPEWORK
                28mm     1.5mm    R250/R290  1.80m    2.40m
                                                                Making provision for thermal movement is vital where pipework of any
                35mm     1.0mm    R250/R290  2.40m    3.00m     material is installed under screed or plaster or passes through brick or
                35mm     1.2mm    R250/R290  2.40m    3.00m     blockwork. The preferred practice is to use tubing with factory applied
                35mm     1.5mm    R250/R290  2.40m    3.00m     protective plastic covering incorporating air gaps to accommodate
                42mm     1.0mm    R250/R290  2.40m    3.00m     thermal movement or to pass tubes and pipes through sleeves or
                42mm     1.2mm    R250/R290  2.40m    3.00m     conduits or to lay them in ducts surrounded by loose, inert non-rigid
                                                                material such as vermiculite or glass wool. For further information,
                42mm     1.5mm    R250/R290  2.40m    3.00m
                                                                consult the publication BS 66.700:2006 Design, installation, testing
                54mm     1.0mm    R250/R290  2.70m    3.00m
                                                                and maintenance of services supplying water for domestic use within
                54mm     1.2mm    R250/R290  2.70m    3.00m
                                                                buildings their curtilages.
                54mm     2.0mm    R250/R290  2.70m    3.00m     FLUSHING
                64mm     2.0mm    R250/R290  3.00m    3.60m
                                                                The main objective of the flushing process is to remove as much dirt
               66.7mm    1.2mm    R250/R290  3.00m    3.60m
                                                                and debris from the pipework system as possible in order to reduce
                                                                the likelihood of system blockage and to create the best possible
                                                                circumstances for a successful chemical clean and subsequent water
                Maximum spacing of support brackets for copper tube to BS EN 1057
                                                                treatment regime so that any hygiene problems and corrosion damage
                Size   Wall thickness  Temper  Horizontal pitch  Vertical pitch  within a system are largely prevented.
               66.7mm    1.2mm   R250/R290  3.00m     3.60m     The level of cleanliness achievable by system flushing is very much
               66.7mm    2.0mm   R250/R290  3.00m     3.60m     dependant on the adequacy of the system design and installation
               76.1mm    1.5mm   R250/R290  3.00m     3.60m     with regard to flushing. Provision should be included in the system for
                                                                adequate air venting, draining and bypassing of equipment.
               76.1mm    2.0mm   R250/R290  3.00m     3.60m
               88.9mm    2.0mm   R250/R290  3.00m     3.60m     Consideration should be given to the ’Flushing Velocity‘ and should be
               108mm     1.5mm   R250/R290  3.00m     3.60m     based on the largest pipe size in the system section to be flushed.
               108mm     2.5mm   R250/R290  3.00m     3.60m
                                                                                                                    129